19A NCAC 06B .0404 ELIGIBLE COSTS
Costs eligible for RIAP funding are as follows:
(1) Reasonable engineering costs;
(2) Site preparation, including necessary grading and drainage to construct track(s);
(3) Track construction;
(4) Switches; and
(5) Grade crossings and signals.
History Note: Authority G.S. 136-44.36; 143B-350(f) and (g);
Eff. April 30, 1997;
Amended Eff. April 1, 1999;
Pursuant to G.S. 150B-21.3A, rule is necessary without substantive public interest Eff. October 24, 2015.